Schooner Porcupine Construction Update
The sheer strakes are all on, bunged, and sanded. The covering boards are going on, the king planks are on, the decking continues. The Erie High School Maritime
Call Us Today! (814) 456-4077 | info@bayfrontcenter.org
The sheer strakes are all on, bunged, and sanded. The covering boards are going on, the king planks are on, the decking continues. The Erie High School Maritime
A cubic foot of solid steel weighs 490 pounds. The same volume of lead tips the scales at 707. Depleted uranium? Eleven eighty-six. Roofing pitch? Sixty. The fabulous void
Hello Fans of Porcupine and BMC, At roughly 42 by 15 feet, Porcupine inhabits a rather large section of both the BMC boatshop and our current organizational focus. She
While it was technically the first week of spring, the weather for last Friday’s “Gunboat Gathering” carried the bite of a wet winter wind across the largely ice-shelled waters
We're off to a good start and are continuing to seek community sponsors, donors, and partners.
The Bayfront Maritime Center invites the public to “Break the Ice” on Friday, March 27th from 5:00pm to 8:00pm.
Hello fans of BMC and the Porcupine Project, Each step of the Porcupine Project draws the plan closer to actuality by some measure, large or small. As one of these steps, the recently
Hello fans of BMC and the Porcupine Project, Porcupine’s path from concept to sailing will be paved with drawings from our Naval Architect, Iver Franzen. Each one is meticulously crafted and necessary to
A Preliminary Drawing of the finished Porcupine Hello fans of BMC and the Porcupine Project, Today I officially join the BMC staff as Project Manager for Porcupine.
Help Float Our Boat! Thanks to Dan Henninger and Ed Bernik for the awesome video about the Porcupine Project.